HEPA DUST EXTRACTION RAMS & COSHH £5M LIABILITY FREE QUOTE

Post-Construction Cleaning, Practical-Completion Ready

Post-construction, post-build, and after-builders cleaning across London, Edinburgh, Glasgow, Birmingham, Coventry, Gloucester, Swindon, Cambridge, and Bedford. Rough, final, and sparkle cleans for developers, contractors, architects, project managers, and estate agents.

Standard domestic cleaning cannot handle the scale of builders' dust, paint splatters, silicone marks, adhesive residue, and fine masonry dust that a construction project generates. The Complete Post-Build Cleaning Package uses industrial HEPA dust extraction, eco-safe degreasers, and a phased process (rough, final, sparkle) to hand over a property genuinely move-in ready.

New builds, renovations, extensions, loft conversions, kitchen and bathroom fits, office refurbs, retail fit-outs, and multi-unit developments. Full RAMS and COSHH documentation, PPE-compliant teams (hard hats, hi-vis, FFP3 masks), £5m public liability insurance, multi-site capable.

Excellent Trustpilot reviews Care N Tidy post-construction cleaning UK Trusted by UK developers, contractors & project managers
Post-construction cleaning Care N Tidy UK HEPA dust extraction handover
REAL RESULTS

Before & After

See the difference our full sparkle clean makes to a newly built room covered in fine plaster dust.

Post-construction room before cleaning
Before
Post-construction room after cleaning
After
DBS-Checked Staff
£5m Public Liability
RAMS Supplied
COSHH Compliant
PPE & Hi-Vis on Site
24H Re-Clean
DEFINITION

What is Post-Construction Cleaning?

Post-construction cleaning (also called post-build cleaning, after-builders cleaning, sparkle cleaning, handover cleaning, or practical completion cleaning) is the specialist deep clean a property requires after construction, renovation, or fit-out work is completed. Standard domestic cleaning cannot handle the volume of builders' dust, silica, paint splatters, silicone marks, adhesive residue, protective-film removal, and fine masonry dust that hang in the air for weeks after trades leave.

Industry practice divides post-construction cleaning into three phases. Here is the honest comparison.

Rough Clean (Debris)

  • Runs during trade phases
  • Large debris removal
  • Heavy dust between stages
  • Trades still on site
  • Prevents dust settling into finishes
  • Typically 1 to 2 visits per project

Final Clean

  • After all trades leave site
  • Paint splatter, silicone, adhesive
  • Protective film, tape removal
  • Interior dust, ceiling to floor
  • Inside cupboards and drawers
  • Bathroom and kitchen sanitation

Sparkle Clean (Handover)

  • Final handover-ready pass
  • Glass, glazing, mirrors polished
  • Fixtures and fittings detailed
  • Final fine-dust HEPA pass
  • Photo walkthrough report
  • Move-in or handover-ready sign-off
FLAGSHIP PACKAGE

The Complete Post-Build Cleaning Package

Every Care N Tidy post-construction project runs under our Complete Post-Build Package: HEPA dust extraction, paint and silicone removal, floor protection removal, window and glazing detail, inside-cupboard cleaning, fixture polish, waste removal, and handover walkthrough. RAMS and COSHH supplied for every site, PPE-compliant teams, £5m public liability. Multi-site capable, deadline-matched scheduling.

WHAT'S INCLUDED

Every Post-Build Clean Includes

HEPA Dust Extraction

Industrial-grade HEPA vacuums capture 0.3-micron particles including silica dust. Ceiling to floor, skirting, vents, fixtures.

Paint & Silicone Removal

Paint splatter, silicone marks, adhesive residue, grout haze. Scraping and solvent-safe methods.

Floor Protection & Tape

Protective film, dust sheets, hardboard, and construction tape cleared carefully, no damage to new floors.

Window & Glazing Detail

Interior and exterior glass, frames, sills, manufacturer sticker and protective film removal.

Cabinet & Drawer Interiors

Inside every cupboard, drawer, wardrobe, and fitted storage unit. Dust removed, hinges wiped.

Fixture & Fitting Polish

Taps, handles, switches, radiators, lights, appliances polished streak-free and sanitised.

Waste Removal & Recycling

All construction waste bagged, sorted for recycling, removed per local council regulations.

Handover Walkthrough

Room-by-room sign-off with client or contractor, photo report emailed, snag list resolved.

PROJECT TYPES

Cleaning for Every Type of Project

From a single-room kitchen fit to a multi-unit housing development, we scale the team and process to match your project.

New Build Residential

Single homes and multi-unit developments. Move-in ready handover, photo-documented sign-off.

New Build Commercial

Office blocks, retail units, hospitality venues, mixed-use developments. RAMS supplied.

Renovation

Full-house or single-room renovations. Dust, paint, silicone, grout haze all handled.

Extension

Single-storey, two-storey, rear, side, wrap-around extensions. Full integration clean with existing house.

Loft Conversion

Full loft clean including Velux windows, pitched ceilings, stairs access. Specialist dust containment.

Kitchen Fit

Worktop silicone, appliance stickers, splashback grime, cabinet interiors, protective film.

Bathroom Fit

Grout haze, tile polish, silicone cleanup, chrome fixtures, shower glass protection film.

Office & Retail Fit-Out

Open-plan offices, retail fit-outs, coworking, hospitality. Scheduled for tenant move-in deadlines.

OUR PROCESS

Our 4-Step Phase Process

Every project runs under a coordinated four-stage approach aligned with your build programme.

1

Site Survey

Free site visit for projects over 10 units. Scope assessed, RAMS drafted, PPE and access requirements confirmed, fixed quote issued.

2

Rough Clean

Runs during trade phases. Large debris removed, heavy dust extracted, dust sheeting moved. Keeps site workable for next trade.

3

Final Clean

After all trades leave. Paint splatter, silicone, adhesive, protective film removed. Interior dust, inside cupboards, bathroom and kitchen sanitation.

4

Sparkle & Handover

Final fine-dust pass, glass polish, fixture detail. Room-by-room walkthrough with you, photo report emailed, sign-off.

HEPA DUST EXTRACTION

Industrial HEPA Equipment, Silica-Safe Protocols

Construction dust is not household dust. It includes crystalline silica from concrete, brick, mortar, and tile cutting. Inhaled silica causes silicosis and is a Health and Safety Executive (HSE) regulated hazard. Standard cleaning vacuums capture down to 10 microns at best. Silica particles are 0.3 to 5 microns and pass straight through.

Our industrial HEPA vacuums are rated for 0.3-micron capture, combined with cyclone pre-separators for bulk debris, wet-dust methods where applicable, FFP3 respiratory protection for our teams, and containment sheeting to prevent dust migration to adjacent rooms. Silica handling is part of our standard RAMS on every active-site project.

  • Industrial HEPA vacuums, 0.3-micron capture
  • Cyclone pre-separator for bulk debris
  • FFP3 respiratory protection for teams
  • Wet-dust methods where applicable
  • Containment sheeting to prevent migration
  • Ceiling to floor including vents and skirting
HEPA dust extraction post-construction silica Care N Tidy
Paint silicone adhesive removal post-construction Care N Tidy
RESIDUE REMOVAL

Paint, Silicone & Adhesive Specialist Removal

The residues contractors leave behind are what ruin a handover. Paint splatters on windows and skirting, silicone smears on glass and tiles, sticker residue on new appliances, tape glue on frames, grout haze on newly-tiled floors, and construction-tape adhesive on everything. Standard cleaners do not reach these. We specialise in all of them.

Scraping and solvent-safe methods protect the new finishes below. We match the solvent to the residue: water-based paint splatters use warm water with mild alkaline, oil-based use citrus solvents, silicone uses specialist silicone removers that do not affect glass or tile, grout haze uses acid-free haze removers. No chemical damage, no scratching, no streaks.

  • Paint splatters (water-based and oil-based)
  • Silicone marks on glass, tile, worktops
  • Adhesive and sticker residue
  • Construction tape glue
  • Grout haze on tiles and stone
  • Plaster residue and cement splashes
HAZARDOUS MATERIALS

What We Handle, What We Refer Out

Honest scope. We handle construction dust, silica, VOCs, and formaldehyde. We do not touch asbestos or lead paint, those need HSE-licensed specialists.

Our Remit

Crystalline silica dust, fine masonry dust, construction dust, general builders debris. HEPA-captured with FFP3 respiratory protection and containment sheeting.

VOC & Formaldehyde

New paint, sealants, carpets, and engineered-wood joinery off-gas VOCs and formaldehyde for weeks. We include cross-ventilation protocols and VOC-reduction passes for sensitive projects (medical, nursery, allergy households).

Refer Out , Asbestos & Lead Paint

Asbestos and lead paint removal are HSE-regulated, licensed work. We do not touch these. If your site has either, book an HSE-licensed specialist first. We return after clearance certificates for the post-remediation clean.

SITE SAFETY

Full Site Safety & Compliance

Four compliance pillars documented and supplied on every active-site project. Main contractors and developers receive all paperwork for their site files.

RAMS Documentation

Risk Assessment and Method Statements tailored to your site. Hazards identified, controls documented, reviewed annually. Supplied for your site file.

COSHH Data Sheets

Control of Substances Hazardous to Health. Data sheets supplied for every product used. Low-toxicity, biodegradable formulas.

PPE, Hard Hat & Hi-Vis

Teams in hard hats, hi-vis, steel-toe boots, FFP3 masks for silica work, gloves, ear defenders as needed. Site-PPE-ready on arrival.

Site Induction Ready

Teams complete site-specific inductions, follow foreman authority, respect site rules. CSCS cards available on request.

TRADE SUPPORT

Trusted by UK Construction Professionals

Five audiences we serve directly, each with tailored scope, documentation, and scheduling.

Developers

Multi-unit, phased payment, per-unit fixed quotes, dedicated account manager, single invoice across sites.

Main Contractors

RAMS and COSHH for site files, coordinated rough + final + sparkle, aligned with practical completion.

Architects

High-finish handover for luxury residential and commercial schemes where presentation sells the design.

Project Managers

Deadline-matched scheduling, phased cleans across build programme, single POC for the cleaning trade.

Estate Agents

Move-in ready handover for new build sales, rental turnover after refurb, viewing-ready presentation.

RESPONSE SLA

Practical-Completion Response Times

  • Free quoteWithin 2 hours
  • Site visit (10+ unit projects)Within 48 hours
  • Project start after confirmation24 to 48 hours
  • Emergency practical-completionSame-day possible
  • Snag list responseNext working day
  • Re-clean under guaranteeWithin 24 hours
SCALE CAPABILITY

Multi-Site & Deadline-Matched

Our standard team is 2 to 4 cleaners per site. For multi-unit and tight-deadline projects we scale to:

  • Teams of 6 to 12 for single large sites
  • Multi-site parallel deployment
  • Phased scheduling aligned with trade programme
  • Emergency practical-completion coverage
  • Single account manager for entire contract
  • Consolidated invoicing, phased payment available
INCLUDED FREE

Free Bonuses With Every Post-Build Booking

Bonus 1

Free Window Shine Treatment

Streak-free glass polish on interior glazing. Included on every post-construction clean.

Bonus 2

Free Floor Protection Removal

Dust sheets, cardboard, hardboard, self-adhesive film all removed and disposed of as part of the service.

Bonus 3

Free Handover Walkthrough Report

Photo-documented sign-off report emailed after every project. Useful for snag-list closure and warranty documentation.

Bonus 4

Free 24H Re-Clean Guarantee

Flag any concern within 24 hours of handover and we return free of charge. No excuses, no call-out fee.

THE CARE N TIDY EDGE

Why Developers Choose Care N Tidy

Industrial HEPA Equipment

Commercial-grade HEPA vacuums, cyclone pre-separators, dust-containment sheeting, FFP3 respiratory protection.

Full Compliance Docs

RAMS, COSHH data sheets, PPE records, site-induction ready. Supplied for every active-site project.

£5m Public Liability

£5 million public liability insurance plus employer's liability cover. Certificates available on request.

Multi-Site Scale

Teams of 6 to 12 for large sites, parallel deployment across multiple units, deadline-matched scheduling.

BY THE NUMBERS

Post-Construction Cleaning at Scale

500+

Post-Build Projects Delivered

£5m

Public Liability Insurance

9

UK Regions Served

24H

Re-Clean Guarantee

CLIENT VOICES

What UK Construction Professionals Say About Our Service

"We handed over a 28-unit development across three blocks. Care N Tidy supplied RAMS for every block, scaled to 8 cleaners per sparkle clean, and hit every practical-completion date within the 48-hour turnaround. Single invoice, phased payment, zero complaints from homebuyers. Booked for our next scheme."

, N.V., Property Developer, Multi-Unit Residential, London

"Commercial fit-out in Birmingham with tenant move-in non-negotiable. Care N Tidy ran rough cleans during our trade phases, kept the site workable, then delivered final and sparkle cleans in 36 hours. EHO-ready kitchens and washrooms, all compliance docs on file. They simplified our handover."

, T.B., Main Contractor, Commercial Fit-Out, Birmingham

"Luxury Cotswolds renovation, client expecting magazine-shoot finish. The finish we hand over sells the design, and Care N Tidy know that. Silicone removed from every panel edge, paint splatter from the bespoke joinery, VOC-reduction pass before the client stepped in. Walk-in ready, photo report signed off. Superb."

, A.C., Project Manager, Luxury Residential, Gloucestershire

Care N Tidy Trustpilot rated Excellent UK post-construction cleaning
FULL RANGE

Our Full Range of Cleaning Services

SAFE DISPOSAL PROMISE

Our SAFE DISPOSAL Promise & COSHH Compliance

Every product we use on a post-construction site is COSHH-compliant, biodegradable, and selected for low-toxicity, low-fume performance. Waste is sorted for local council recycling streams. Hazardous debris (construction solvents, paint residue, asbestos-contaminated material) is handled under UK waste regulations and routed to licensed specialists where required.

Biodegradable, COSHH-registered
Council-compliant recycling
Licensed specialist referral for hazardous waste
Cruelty-free, ethically sourced
Low-VOC formulas
Data sheets supplied on request
REFER A BUILDER

Refer a Builder or Developer, Both Save

Happy with your post-build handover? Refer a main contractor, developer, architect, or project manager. Both of you receive a thank-you discount on your next project. No cap, no catch.

Ask About Referral
HOW IT WORKS

Simple. Seamless. Spotless.

1

Site Survey & Quote

Share your site address, project scope, phase (rough / final / sparkle), and deadline. Free site visit for projects over 10 units. Fixed quote within 48 hours.

2

Phased Cleaning

Teams arrive with HEPA equipment, RAMS, and PPE. Rough cleans during trade phases, final and sparkle at practical completion. Multi-site parallel deployment.

3

Handover Sign-Off

Room-by-room walkthrough, photo report emailed, snag list resolved. 24-hour re-clean guarantee active. Invoice issued, consolidated for multi-unit contracts.

FAQ

Frequently Asked Questions

33 answers covering service, project types, phases, safety, compliance, scope, and pricing.

What is post-construction cleaning?
Post-construction cleaning (also called after-builders cleaning, post-build cleaning, or sparkle cleaning) is the specialist deep clean a property requires after construction, renovation, or fit-out work is completed. Standard cleaning cannot handle the scale of builders' dust, paint splatters, silicone marks, adhesive residues, and fine masonry dust. Professional post-construction cleaning uses industrial HEPA dust extraction, eco-safe degreasers, and a phased approach (rough clean, final clean, sparkle clean) to hand over a property move-in ready.
What is the difference between rough clean, final clean, and sparkle clean?
Rough clean (debris clean) happens while trades are still on site, removes large debris and heavy dust between phases. Final clean happens after all trades leave, tackles paint splatters, silicone, adhesive, tape residue, interior dust. Sparkle clean is the handover-ready pass, glass polished, fixtures detailed, fine dust removed, walkthrough photographed. Care N Tidy supplies all three.
What is included in a post-build clean?
HEPA dust extraction on every surface including skirting, vents, and high-level fittings. Paint splatter, silicone, and adhesive removal. Floor protection and construction tape removal. Window and glazing detail (inside and outside on accessible windows). Inside cupboards, drawers, and wardrobes. Fixture and fitting polish. Waste removal and recycling. Bathroom and kitchen sanitation. Full handover walkthrough.
How soon after the builders finish can you start?
We typically start within 24 to 48 hours of construction completion, and can often start the same day for urgent handover deadlines. For multi-phase projects we coordinate with your contractor to provide rough cleans during build stages and final sparkle cleans at practical completion.
How long does a post-construction clean take?
Residential renovation (single room or extension): 4 to 8 hours. Full new build house: 1 to 2 days. Multi-unit development: scheduled per block, teams of 4 to 8 deployed. Commercial fit-out: scaled to project size and deadline. Most residential projects completed within 24 to 48 hours.
Do you clean new build residential properties?
Yes. New build residential is a core service. Full sparkle clean ready for tenant or owner move-in, photo-documented handover report included. Multi-unit housing developments handled with scaled teams and deadline-matched scheduling.
Do you clean commercial and office fit-outs?
Yes. Office refurbs, retail fit-outs, coworking spaces, hospitality venues, medical practices, showrooms. RAMS documentation supplied, PPE-compliant, EHO-ready for food-service venues. Scheduled around tenant move-in or practical completion deadlines.
Do you clean renovations and extensions?
Yes. Kitchen refurbs, bathroom refurbs, single-storey and two-storey extensions, rear and side extensions. Floor protection removal, paint splatter, silicone on new worktops, grout haze on tiles, all handled as standard.
Do you clean loft conversions and kitchen or bathroom fits?
Yes. Loft conversions, kitchen-only fits, bathroom-only fits, garage conversions, basement fits. Each project has specific access and dust-containment challenges we handle as part of the scope. Quoted per project.
Can you handle multi-unit housing developments?
Yes. Multi-site, multi-unit capability with teams of 4 to 8 per block. Sequential cleaning aligned with your handover schedule, single consolidated invoice, dedicated account manager, and phased payment available. Developer contracts welcome.
Do you provide RAMS (Risk Assessment and Method Statements)?
Yes. Full RAMS documentation supplied to main contractors, developers, and project managers for every active-site clean. Tailored to your site, reviewed annually, compliant with UK construction industry standards. Essential for insurance and site audits.
Do you provide COSHH data sheets?
Yes. Every product we use on site is COSHH-registered. Data sheets supplied for your site file, product list updated if the project has specific sensitivity requirements (medical, nursery, food service).
Do your teams wear PPE, hard hats, and hi-vis on site?
Yes. PPE standard: hard hats, hi-vis, steel-toed boots, dust masks (FFP3 for silica-dust work), gloves, ear defenders where needed. Teams complete site induction, comply with site-specific PPE requirements, and respect site foreman authority on-site.
How do you handle crystalline silica dust?
Silica dust (from concrete, brick, mortar, tile cutting) is a serious respiratory hazard. We use industrial HEPA vacuums rated to capture 0.3-micron particles, wet-dust methods where applicable, FFP3 respiratory protection for our teams, and containment sheeting to prevent dust migration. Silica handling is part of our standard RAMS.
Do you handle asbestos, lead paint, or other licensed-waste materials?
No. Asbestos and lead paint removal require HSE-licensed specialists under strict UK regulations. We do not touch these materials. If your site has either confirmed or suspected, book an HSE-licensed asbestos or lead-paint specialist to remove first. Our team will return after clearance certificates are issued for the post-remediation clean.
Can you remove paint splatters and plaster residue?
Yes. Paint splatters (water-based and oil-based), plaster residue, silicone marks, grout haze, and adhesive spots are all standard scope. We use scraping and solvent-safe methods with surface protection to avoid scratching finishes.
Can you remove silicone marks and grout haze?
Yes. Silicone marks on glass, tiles, worktops, and bathroom fittings respond to specialist silicone removers. Grout haze on newly-tiled floors and walls is cleared with acid-free grout haze removers that do not damage grout lines or sealants.
Do you clean inside cupboards, drawers, and wardrobes?
Yes. Inside every cupboard, drawer, wardrobe, and fitted storage unit. Dust settles inside closed joinery during construction, and handover-ready means clean inside as well as out. Hinges wiped, soft-close mechanisms checked.
Do you clean windows and glazing, including tape and sticker residue?
Yes. Interior and exterior window cleaning on accessible windows (up to second floor via ladder or reach-and-wash pole), frame dust removal, sill polish, manufacturer sticker and protective tape removal from glass, frames, and appliances.
Do you remove protective floor covering and construction tape?
Yes. Protective floor covering (dust sheets, cardboard, hardboard, self-adhesive film) is removed carefully to avoid damaging the new floor beneath. Construction tape residue on skirting, frames, and fixtures is cleared with heat-safe solvents.
How much does post-construction cleaning cost in the UK?
UK post-construction cleaning is priced per project, not per hour. Cost depends on property size (per square foot for commercial, per-property for residential), project stage (rough vs final vs sparkle), condition of the site, and whether multi-phase coordination is required. Request a free quote with your site address and scope, we respond within 2 hours.
Do you provide fixed-price quotes for developers?
Yes. Developer and main-contractor clients receive fixed-price per-unit or per-phase quotes with clear exclusions stated upfront. Phased payment terms available for multi-unit developments. Site visit included for projects over 10 units.
Can you scale the team for multi-site or tight-deadline projects?
Yes. Standard team size is 2 to 4 cleaners. For multi-unit and tight-deadline projects we scale to teams of 6 to 12, working across multiple units or floors simultaneously. Emergency practical-completion deadlines handled on request.
Are your cleaners DBS-checked and insured?
Yes. Every Care N Tidy post-construction cleaner is enhanced-DBS-checked, reference-checked, and covered by £5 million public liability insurance plus employer's liability insurance. Site-induction ready, RAMS and COSHH compliant.
What if I am not satisfied with the handover clean?
Flag any concern within 24 hours of sign-off and we return free of charge to address the flagged area. Our 24-hour re-clean guarantee applies to every post-construction project, including multi-unit developments where each unit is guaranteed individually.
What is post-construction cleaning called in the industry?
Common industry terms are post-construction cleaning, post-build cleaning, after-builders cleaning, sparkle cleaning, handover cleaning, builders cleaning, and practical completion cleaning. All describe the specialist deep clean between trades finishing and move-in or handover.
Is post-construction cleaning residential or commercial?
Both. Residential covers new builds, renovations, extensions, loft conversions, and private refurbs. Commercial covers office fit-outs, retail, hospitality, medical, education, and industrial projects. We handle all categories under the same phased process with project-specific RAMS.
Who is responsible for post-construction cleaning on a new build site?
Typically the main contractor or developer contracts post-construction cleaning as a separate trade. It is rarely included in general trade quotes. For private renovations the homeowner or project manager books direct. For multi-unit, it is usually the developer's line-item, budgeted per unit.
Is post-construction cleaning worth it?
For any project over a small single-room refresh, yes. DIY or standard cleaning cannot handle the volume of fine dust, silica, silicone, and paint residue that a build generates. Skipping it delays move-in, triggers snag-list disputes, and leaves toxic residue for occupants. Professional post-construction cleaning is standard practice in UK new build and fit-out contracts.
When should you book post-construction cleaning?
Book as early as possible in the project timeline. Ideally during trade mobilisation so we can schedule rough cleans between phases and a final sparkle clean at practical completion. Last-minute booking is possible (24 to 48 hours) but risks scheduling conflict for tight deadlines.
What are the common post-construction cleaning mistakes to avoid?
Five common mistakes: (1) booking a regular domestic cleaner who lacks HEPA equipment, (2) skipping the rough clean between phases (dust settles into finishes), (3) ignoring protective-film removal (it adheres permanently after a few weeks), (4) forgetting inside cupboards and drawers, (5) choosing a cleaner without RAMS and PPE compliance for active sites. Our process avoids all five.
Do you handle formaldehyde and VOC residue from new materials?
Yes. New paints, sealants, carpets, and engineered-wood joinery off-gas VOCs including formaldehyde for weeks after installation. Our post-construction clean includes air-quality sensitive products, cross-ventilation protocols, and for sensitive projects (medical, nursery, chemically-sensitive clients) an additional VOC-reduction pass. Especially recommended for post-renovation households with infants, asthmatics, or cancer-recovery residents.
How much is after-builders cleaning in London?
London after-builders cleaning is priced per project because London sites vary enormously by access, square footage, and scope. We do not publish a fixed London rate. Share your postcode, property size, and phase (rough / final / sparkle), we return a tailored London post-construction cleaning quote within two hours.
FREE PROJECT QUOTE

Get a Post-Construction Cleaning Quote in 2 Hours

Every build is different. Share your site address, project scope (new build, renovation, extension, fit-out), phase (rough / final / sparkle), and practical-completion deadline. We respond within two hours during working hours with a tailored fixed-price quote. Developer and contractor accounts welcome.

Book Your Post-Build Clean Today, It's Easy

HEPA dust extraction, RAMS & COSHH, PPE-compliant, £5m public liability, multi-site capable. New builds, renovations, extensions, fit-outs across 9 UK regions.